Packaging suppliers: account expansion
Use this account expansion exercise to explore an additional need only after establishing that the existing work is useful. You are discussing a packaging development and supply order with an operations lead launching a physical product. The point of the practice is to make a useful decision together, including recognising when the offer is not a fit.
Identify a genuinely useful additional scope or decide that expansion would be premature.
The situation
In this fictional brief, design, packing efficiency and transport requirements are not aligned. The buyer wants a specification tested against the actual product and packing process. Your offer is a packaging development and supply order, but you must first establish whether its scope addresses the actual need.
A relevant delivery constraint is that minimum order quantities and artwork approval affect the schedule. Treat that as a fact in the exercise; do not remove it to make the sale easier.
| Your counterpart | an operations lead launching a physical product |
|---|---|
| Offer under discussion | a packaging development and supply order |
| Evidence available | a physical sample with dimensions, material and agreed test results |
| Terms to clarify | Confirm specifications, tooling ownership, tolerances, lead times and reorders. |
How to approach account expansion
A useful question for this stage: “What is different about that team’s requirements?” Ask it when the conversation creates a reason for it, rather than reciting every question in order.
- Review the current result. Ask permission to explore a related need. Treat the new scope as a fresh discovery process.
- Ground the discussion in the buyer’s work. Ask: “Which failure matters most: damage, packing time, shelf fit or presentation?” Listen for a concrete example before making a claim.
- Use evidence relevant to the decision: a physical sample with dimensions, material and agreed test results. Explain what it demonstrates and what remains unverified.
- Identify a genuinely useful additional scope or decide that expansion would be premature.
An industry-specific concern
Buyer: “We need a smaller order at the same unit price.”
Possible response: “We can compare material, tooling and production setup costs, then price a smaller batch or an alternative specification.”
Why this response helps: it acknowledges the concern, brings the discussion back to a verifiable requirement and leaves room for a different decision. Adapt the wording to what the buyer actually said.
Run the practice
- Prepare for two minutes. One person takes the seller role and one plays an operations lead launching a physical product. Read the offer and constraint separately from your preferred answer.
- Have a five-minute conversation focused on explore an additional need only after establishing that the existing work is useful. The buyer should answer consistently with the brief and ask for evidence when a claim is vague.
- Add this challenge: A senior sponsor wants a wider rollout but the current users still have unresolved issues. Make those dependencies explicit.
- Pause for feedback. Quote one useful question and one missed opportunity. Repeat the difficult exchange using a different response.
- Finish by writing the actual agreement. A sensible option, when it fits, is to approve a sample and a limited packing trial before the full order. A clear decision to pause is also a useful outcome.
What to avoid
| Common mistake | Using customer loyalty as a reason to skip qualification. |
|---|---|
| A stronger direction | Before extending this, we should check the new team’s goals, constraints and decision process. |
| Scope and claim boundary | Do not make unsupported sustainability or recyclability claims. |
| What to measure in real work | pass rate against the agreed sample and packing checks. Establish a baseline and definition before interpreting a change. |
An example conversation
Is there another team or workflow facing a similar problem, or should we focus on improving the current one?
Our concern is that design, packing efficiency and transport requirements are not aligned. Also, minimum order quantities and artwork approval affect the schedule.
Which failure matters most: damage, packing time, shelf fit or presentation?
We need a smaller order at the same unit price.
We can compare material, tooling and production setup costs, then price a smaller batch or an alternative specification.
What is different about that team’s requirements?
Your working sheet.
Make the exercise your own. Notes are saved in this browser when storage is available. Download a copy to keep; avoid confidential information on a shared device.
Example: design, packing efficiency and transport requirements are not aligned; minimum order quantities and artwork approval affect the schedule.
Example: What is different about that team’s requirements? Industry question: Which failure matters most: damage, packing time, shelf fit or presentation?
Example: a physical sample with dimensions, material and agreed test results. Do not make unsupported sustainability or recyclability claims.
Example: Propose a clear next step, such as: approve a sample and a limited packing trial before the full order. Confirm the owner and date.
Review your work
This is a reflection checklist, not an automated assessment.
Questions
Who is this packaging suppliers exercise for?+
Can I use the example as a script?+
How should I assess the result?+
Fictional training scenario. The dialogue illustrates response choices; it is not a customer testimonial or a record of a real sale.
Explore more sales resourcesTake the conversation further.
Read a practical guide to structuring your sales practice, or explore the current London sales masterclass.
Plan your sales practiceExplore Jordan Belfort in London